|
|
| |
 |
| |
|
Endowed with the grade 1 qualifications for equipment installation
projects and strong capacity and technical force, our Corporation
has undertaken a great number of equipment installation works.
The representative ones include: the installation works of
Zhuhai Sports Center, the equipment installation of Zhuhai
Port Square, the building of the Instruction Center of Zhuhai
Municipal Bureau of Public Security as well as the installation
of wastewater treatment equipment of Zhuhai Xiangzhou Waste
Water Treatment Plant.
|
|
| |
The installation works
of Zhuhai Sports Center |
|
The site of the
project is located within the sports ground of the Sports
Center on Hongshan Road, Zhuhai. The building area is 39,000
square meters. The contracted items included: power distribution,
lighting, air-conditioning, external water supply and drainage.
This project was appraised as the ˇ±Municipal Excellent Projectˇ±
|
|
|
|
| |
The equipment installation
of Zhuhai Port Square |
|
The site of the project
is in front of the Joint Examination Building of Gongbei Port
on S. Yingbin Avenue, Zhuhai. The scope of the project was:
all the ventilation air-conditioning, water supply and drainage,
electrical lighting and fire prevention, etc. The total building
area was 112,882 square meters and the cost of project was about
RMB 79.61 million. |
|
|
|
|
|
| |
The Directing Center
Building of Zhuhai Bureau of Public Security |
| |
The site of the project is located
to the north of Meihua Road in Zhuhai and the scope of project
included: ventilation air-conditioning, water supply and drainage,
electrical and fire prevention, etc. With a total building area
of 34,781 square meters, the project was appraised as the ˇ°Provincial
Excellent Projectˇ±. |
|
|
|
|
|