| The water supply
and drainage of Hongta municipal works--------
The site of the project is located at W.
Jinji Road, Qianshan, Zhuhai and the contracted items were:
roads of the factory area, drainage works, support bases and
cable ditches, 200-1200m piping network with an area of 35,000
square meters. The completion time was March 2000 and the
construction cost of the project was about 30.6 million yuan. |
|
|